Hire Projects

A challenging new design for ACE Winches, the client required a significantly smaller riser pull-in equipment package than the traditional model to be incorporated into their existing framework on the main deck level on the Lucius spar platform.

With limited deck space and extreme operating…

Read more


The Çanakkale 1915 is a 3.7km suspension bridge being built over the Dardanelles Strait in the Çanakkale province of Turkey. Located at the western end of the Marmara Sea. The new bridge is expected to improve the transportation network in the country, and promote socio-economic growth and…

Read more


Scope of Supply

2 x 120te Mooring Winch Packages 4 x ACE 80te Deck Winch Packages 16 x ACE Operational Personnel

ZPQ Platform

The Zawtika Processing and Living Quarters platform produces gas for supply to Myanmar and Thailand. The project development also includes the Kakonna and Gawthaka gas…

Read more


Scope of Supply

1 x ACE 120te Topside Load-out Winch Package 6 x ACE Operational Personnel

LSP-1 and LSP-2 Platforms

LSP-1 is the primary production facility at the Yuri Korchagin field, performing drilling and process operations. The platform is supported by the LSP-2 accommodation unit. The…

Read more


Client: Saipem Project: S45 Barge for Zawtika ZPQ Scope of Work: ACE Floatover Installation Package Project Details

ACE Hire Equipment commissioned a Floatover Installation Package for Saipem, Singapore.

Accompanied by six ACE Hire Personnel, six winch packages were mobilised including two ACE…

Read more


The ACE Linear Chain Winch has been designed to accommodate 84mm chain. Unlike a conventional rotary winch, the Linear Chain Winch is not constrained by the amount of product the winch drum can hold, or suffer loss of pulling power as the product spools higher onto the drum. The Linear Winch is…

Read more


Client: MMHE/TPGM Project: Petronas Carigali Block 1 Development, offshore Turkmenistan Scope of work: GBSand topside load-out package   CHALLENGE: To provided GBS and topsides Load-out package and personnel support for the Turkmenistan Block 1 Development MCR-A platform. The first phase of…

Read more


The ACE 50te SWL 4-Track Tensioner includes a caterpillar track system for hauling or veering cable, umbilical, steel pipe or similar round tubular products. The unit is designed for horizontal deployment. Enclosed within a lift frame the tensioner operates by gripping the product between four…

Read more


The 500te RDS was designed and manufactured at ACE Winches facilities. The product range includes a 200te and a 400te RDS  which were  developed for high tension spooling and have been used in the deployment and recovery of subsea products such as umbilicals, risers and flow lines, flexible…

Read more


SOLUTION:

We designed, engineered and manufactured two 120te Hydraulic Drum Winch packages for the project.  As part of the supply, we delivered a bespoke wireless control system which allowed the winches to be synchronised for simultaneous operations from the two locations. 

HPU CONTROL…

Read more